A66 - Access and Haul roads
BALFOUR BEATTY CIVIL ENGINEERING LIMITED · Construction work · United Kingdom
What the buyer wants
The Supplier is required to strip topsoil, including residual vegetation clearance and deposition in Topsoil Storage Areas. Topsoil stockpiles are to be managed by the Subcontractor for the duration of the subcontract works, including spraying and treatment necessary by the Subcontractor to maintain the integrity of the material for re-use.
The supplier is required to undertake site clearance, to include but not limited to:
Wall removal and set aside for reuse
Fence removal and disposal
Gate removal and disposal
Kerb and drainage removal and disposal
Sign post removal and disposal
Allowance for removal / cutting of tree root systems and disposal
Allowance for hard dig and disposal of arisings
Also open in Construction
Browse open tenders
Stop finding out when someone else wins
Tell us what your firm does and we'll email the tenders you could win, while there's still time to bid. Free, no card.
Watch this for me