UK2 - Preliminary Market Engagement Notice RDF

NETWORK RAIL INFRASTRUCTURE LIMITED · Transport equipment · United Kingdom

This tender has closed. It is no longer accepting bids. Set up a free profile and the next one like it lands in your inbox while there's still time to bid.
Buyer
NETWORK RAIL INFRASTRUCTURE LIMITED
Value
£130,000,000
Deadline
No deadline listed
Published
30 July 2026
Sector
Transport equipment
Where
United Kingdom

What the buyer wants

Network Rail's existing fleet of Rail Delivery Trains (RDTs) and Long-Welded Rail Trains (LWRTs) is approaching the point at which replacement options must be considered.

Network Rail currently anticipates a future requirement for:

• A fleet of approximately 8-11 trains.

• A locomotive-hauled solution capable of both rail delivery and rail recovery activities.

• A solution capable of carrying a minimum of 24 rails per train.

• Remote operation of rail handling equipment to minimise manual intervention and improve operational safety.

Engagement undertaken with the market to date has identified several opportunities for consideration as part of the sourcing strategy and technical requirements, including separate procurement of wagons and material handling equipment (MHE), and the development of a modular design making use of intermodal wagons. Network Rail requires market feedback to determine whether these opportunities should be established as requirements within the sourcing activity.

Market feedback is therefore sought to help Network Rail understand the implications of adopting these requirements, including:

• Impact on market appetite

• Impact on design and delivery risks and timescales

View the official notice ↗

Still open in this sector

Browse open tenders

Stop finding out when someone else wins

Tell us what your firm does and we'll email the tenders you could win, while there's still time to bid. Free, no card.

Watch this for me